General Labour

General Labourer

General Labourer for male available at ECG Engineering and Consulting Group

Thank you for reading this post, don't forget to subscribe!

END DATE: NOT SPECIFIED

General Labourer

Organization Portrayal:
ECG Designing and Counseling Gathering is situated in Centurion and activities cross country, in all SA territories. We direct reviews on cellphone pinnacles and compound support on tower locales.

Follow our Whatsapp channel for additional positions without joins: Follow Here

AREA: PRETORIA, GAUTENG
Contract Type:Contract
Experience Required:1 year
Schooling Level:Grade 12
SALARY: 6.000,00 ZAR Month to month
GANDER:Male
Number of opportunities:1
Set of working responsibilities
Guarantee the telecom site is very much kept up with by leading general routine support nearby.
Principal obligations include:

  1. General Routine Upkeep
  • Eliminate all weeds and trash from site.
  • Guarantee smasher stone is consistently applied, rake level where essential.
  • Report lacking stone pulverize to the Monitor or Associate Investigator for revealing.
  • Clear all substantial and clearing pieces including under client gear covers.
  • Report any significant access street harm to the Investigator or Collaborator Assessor for detailing.
  • Complete site review agenda according to routine upkeep report
  • Treat within site with ecologically endorsed weed executioner.
  • Eliminate all outsider vegetation inside 1m from the Site limit where suitable.
  • Clear weeds 1m (fire break) from the site wall.
  • Rake outside stone smasher dressing and fire break strip consistently.
  • Scale back overhanging branches and shrubs 1 meters from wall edge where suitable.
  • Investigate all banks for disintegration and report harms.
  • Eliminate all minor development/support squander from the area of the site and report any significant discoveries of development squander.
  • Guarantee that checks are re-adjusted and evened out where required.
  • Guarantee that sob openings are clear of obstacles.
  • Fix harmed checks and report where substitution controls are vital.
  • Fix all harmed joints between checks with supported non-recoil grout.
  • Clean unlocked link channels in the sewer vent.
  • Paint rusted sewer vent covers and casings where important.
  • Fitted and fix earth associations at different areas on location and report harmed earth associations.
  1. HSE Consistence
  • Leading site risk appraisal and tool kit talks.
  • Culmination of site related HSE agendas, e.g., apparatus investigations, everyday gamble appraisals.
  • Detailing of HSE occurrences.

Please share to

Related Articles

Back to top button